Previous |  Up |  Next

Article

Title: Optimal lot size determination of multistage production system (English)
Author: Klapka, Jindřich L.
Language: English
Journal: Aplikace matematiky
ISSN: 0373-6725
Volume: 23
Issue: 2
Year: 1978
Pages: 81-97
Summary lang: English
Summary lang: Czech
Summary lang: Russian
.
Category: math
.
Summary: This paper deals with the optimization of total setup plus inventory cost of a certain class of the multistage inventory-production systems with the series arranged production stages having generally different production rates, separated by stores from each other. The optimization is made by the choice of lot sizes across an infinite time horizon. The exact cost-optimization algorithm based on the Bellman optimality principle is derived and applied for deriving two lower bounds of the optimal cost of the above class of systems. These lowe bounds improve that derived by Crowston, Wagner and Williams. Two numerical examples are given. (English)
Keyword: dynamic multistage
Keyword: inventory-production system
Keyword: production stages
Keyword: infinite horizon
Keyword: dynamic model
Keyword: application of dynamic programming
Keyword: algorithmic computation of optimal solution
MSC: 90B05
MSC: 90B30
MSC: 90C50
idZBL: Zbl 0411.90042
idMR: MR0475803
DOI: 10.21136/AM.1978.103734
.
Date available: 2008-05-20T18:08:58Z
Last updated: 2020-07-28
Stable URL: http://hdl.handle.net/10338.dmlcz/103734
.
Reference: [1] R. Bellman: Dynamic Programming.Princeton University Press, Princeton -New Jersey 1957. Zbl 0995.90618, MR 0090477
Reference: [2] W. B. Crowston M. Wagner J. F. Williams: Economic Lot Size Determination in Multistage Assembly Systems.Management Sci. 19 (1973), 517-527. 10.1287/mnsc.19.5.517
Reference: [3] F. Giannessi: Sul controllo della produzione in condizioni di incertezza della domanda e dell'oferta.Calcolo 4 (1967), 179-197. 10.1007/BF02576733
Reference: [4] J. L. Klapka: Dynamic Approaches to the Process Control I. Optimal Lot Sizes Policy of the Multistage Periodic Production Processes.(in Czech). Research Report No. 9. Institute of Theory and Methods of Engineering Production Control, Technical University of Brno, December 1971.
Reference: [4a] J. L. Klapka J. Dvořák: Dynamic Approaches to the Process Control III, IV.(in Czech). Research Report. Institute of Theory and Methods of Engineering Production Control, Technical University of Brno, Juni 1974.
Reference: [5] G. Schussel: Job-Shop Lot Release Sizes.Management Sci. 14 (1968), B 449-B 472. 10.1287/mnsc.14.8.B449
Reference: [6] I. Streck: Mathematical Model of the Differentiated Lot Size in Engineering Industry.Ekonomicko-matematický obzor 6 (1970), 429-437.
Reference: [7] H. A. Taha R. W. Skeith: The Economic Lot Size in Multistage Production Systems.AIIE Transactions 2 (1970), 157-162. 10.1080/05695557008974746
Reference: [8] A. B. Thomas: Optimizing a Multi-Stage Production Process.Operational Research Quarterly 14 (1963), 201-213. 10.1057/jors.1963.27
Reference: [9] W. I. Zangwill: A Deterministic Multiproduct, Multifacility Production and Inventory Model.Operations Research 14 (1966), 486-507. Zbl 0142.17105, 10.1287/opre.14.3.486
Reference: [10] P. Manca: Sul controllo dinamico della produzione e della gestione delle giacenze in condizioni di incertezza della domanda e dei ritardi di consegna.Editrice tecnico scientifica - Pisa, Università di Pisa, dipartimento di ricerca operativa e scienze statistische. Pisa 1973.
Reference: [11] J. L. Klapka: Optimization of Multistage Production System.Quaderno dei gruppi di ricerca matematica del C. N. R., B 14. Editrice tecnico scientifica-- Pisa, Università di Pisa, dipartimento di ricerca operativa e scienze statistiche. Pisa 1975.
Reference: [12] P. A. Jensen H. A. Khan: Scheduling in Multistage Production System with Setup and Inventory Costs.AIIE Transactions 4 (1972), 126-133. 10.1080/05695557208974839
.

Files

Files Size Format View
AplMat_23-1978-2_2.pdf 2.472Mb application/pdf View/Open
Back to standard record
Partner of
EuDML logo