Previous |  Up |  Next

Article

Title: Determination of the initial stress tensor from deformation of underground opening in excavation process (English)
Author: Malík, Josef
Author: Kolcun, Alexej
Language: English
Journal: Applications of Mathematics
ISSN: 0862-7940 (print)
ISSN: 1572-9109 (online)
Volume: 67
Issue: 3
Year: 2022
Pages: 297-318
Summary lang: English
.
Category: math
.
Summary: A method for the detection of the initial stress tensor is proposed. The method is based on measuring distances between pairs of points located on the wall of underground opening in the excavation process. This methods is based on solving twelve auxiliary problems in the theory of elasticity with force boundary conditions, which is done using the least squares method. The optimal location of the pairs of points on the wall of underground openings is studied. The pairs must be located so that the condition number of the least square matrix has the minimal value, which guarantees a reliable estimation of initial stress tensor. (English)
Keyword: initial stress tensor
Keyword: first boundary value problem of the theory of elasticity
Keyword: least square method
Keyword: condition number of matrix
Keyword: continuous dependence of eigenvalues on matrix elements
MSC: 65N30
MSC: 74-xx
MSC: 74A10
MSC: 93E24
idZBL: Zbl 07547197
idMR: MR4409308
DOI: 10.21136/AM.2021.0266-20
.
Date available: 2022-04-14T13:35:50Z
Last updated: 2022-09-06
Stable URL: http://hdl.handle.net/10338.dmlcz/150317
.
Reference: [1] Bhatia, R.: Matrix Analysis.Graduate Texts in Mathematics 169. Springer, New York (1997). Zbl 0863.15001, MR 1477662, 10.1007/978-1-4612-0653-8
Reference: [2] Blaheta, R., Jakl, O., Kohut, R., Starý, J.: GEM -- a platform for advanced mathematical geosimulations.Parallel Processing and Applied Mathematics. Part 1 Lecture Notes in Computer Science 6067. Springer, Berlin (2010), 266-275. 10.1007/978-3-642-14390-8_28
Reference: [3] Haimson, B. C., Cornet, F. H.: ISRM suggested methods for rock stress estimation---Part 3: Hydraulic fracturing (HF) and/or hydraulic testing of pre-existing fractures (HTPF).Int. J. Rock Mech. Min. Sci. 40 (2003), 1011-1020. 10.1016/j.ijrmms.2003.08.002
Reference: [4] Halmos, P. R.: Measure Theory.Graduate Texts in Mathematics 18. Springer, Berlin (1974). Zbl 0283.28001, MR 0033869, 10.1007/978-1-4684-9440-2
Reference: [5] Hudson, J. A., Cornet, F. H., Christiansson, R.: ISRM suggested methods for rock stress estimation---Part 1: Strategy for rock stress estimation.Int. J. Rock Mech. Min. Sci. 40 (2003), 991-998. 10.1016/j.ijrmms.2003.07.011
Reference: [6] Lax, P. D.: Linear Algebra and Its Applications.Pure and Applied Mathematics. Wiley, New York (2007). Zbl 1152.15001, MR 2356919
Reference: [7] Nečas, J., Hlaváček, I.: Mathematical Theory of Elastic and Elasto-Plastic Bodies: An Introduction.Studies in Applied Mechanics 3. Elsevier, Amsterdam (1981). Zbl 0448.73009, MR 0600655, 10.1016/c2009-0-12554-0
Reference: [8] Sjöberg, J., Christiansson, R., Hudson, J. A.: ISRM suggested methods for rock stress estimation---Part 2: Overcoring methods.Int. J. Rock Mech. Min. Sci. 40 (2003), 999-1010. 10.1016/j.ijrmms.2003.07.012
Reference: [9] al., K. Souček et: Comprehensive Geological Characterization of URF Bukov---Part II. Geotechnical Characterization.Final report no. 221/2018/ENG. Ostrava, SÚRAO (2017).
Reference: [10] Sugawara, K., Obara, Y.: Draft ISRM suggested method for in situ stress measurement using the compact conical-ended borehole overcoring (CCBO) technique.Int. J. Rock Mech. Min. Sci. 36 (1999), 307-322. 10.1016/S0148-9062(99)00004-2
Reference: [11] Wiles, T. D., Kaiser, P. K.: {\it In situ} stress determination using the under-excavation technique---I. Theory.Int. J. Rock Mech. Min. Sci. & Geomech. Abstr. 31 (1994), 439-446. 10.1016/0148-9062(94)90147-3
Reference: [12] Wiles, T. D., Kaiser, P. K.: {\it In situ} stress determination using the under-excavation technique---II. Applications.Int. J. Rock Mech. Min. Sci. & Geomech. Abstr. 31 (1994), 447-456. 10.1016/0148-9062(94)90148-1
.

Fulltext not available (moving wall 24 months)

Partner of
EuDML logo